Ibaraki Kenpoku Long Trail Field Survey Report ①

A field survey was conducted on September 5, 2021.

Participants led by the Ibaraki Kenpoku Long Trail Cooperation Corps conducted a field survey to determine the location of the signpost.
We walked from Mt. Washizusan to Mt. Nantai, which we have maintained by ourselves, in a trail running style.
It was moderately cool and the best day for the field survey.

 

Field survey (September 5, 2021)

This time, maintenance / utilization leader outdoor training
This is the second time.
Have a pre-meeting I confirmed today’s flow and division of roles.
14 people from the cooperation team participated.
Since it is a field survey, I do not have the usual pruning scissors and rakes.
Move to the starting point, Mt. Washizusan,
It is a commemorative photo with Mt. Nantai and Mt. Nyotai in the back.
First, aim for the entrance to the mountain trail.
The temperature is not too high and it seems that you can walk comfortably.

The trail tape at the entrance of the mountain trail the color had faded immediately.Wrap a new tape and move on.

Trail tape cut to a certain length,

Give it to each of the cooperative teams it is a strategy to wind while walking.

Wrap the trail tape smoothly I was able to.

Washizusan view point 1
Largely curved Washizusan and Kuji River, you can overlook the scenery of the village.

Washizusan view point 2
After passing the mountaintop,you can also enjoy the scenery from a different angle.

Washizusan view point 3
The view of the village seen through the trees is also wonderful.

There are places on the course where both sides are cut off.
As if you were adventuring you can walk happily.

There are many steep slopes on Mt. Washizusan.
I went down politely without rushing.

At the foot of Mt. Washisu, Oko lacquer and tea plantations spread out.

Next, head to Mt. Chofuku.

before that, I stopped at a convenience store and took a break.

With water and energy I also replenished the trail tape.

Proceed through the village of Korofuji to Chofukuzan, which you can see in front of you.

Arrived at Chofuku Shrine. Don’t forget to visit.

The steps I made in last week’s maintenance without being washed away by the rain every day I was relieved that it remained firmly.

At the view point made by ourselves I enjoyed lunch.

The fruit of Kousa dogwood was also about to be eaten.

After descending Mt. Chofuku, Rehydrate and head to Mt. Nantai.

The paved road to the mountain trail run and move.

A rocky rock continues.
The rain this morning made the moss lively.

Arrived at the summit of Mt. Nantai.
Everyone seemed to be able to walk more …

Heading over the large circle, this field survey is over.

Autumn leaves are still ahead, but I could feel autumn in the mountains.

At this time, Yamajino Hototogisu is in full bloom.
Please try to find it.

 

I returned to the meeting place in the morning and broke up.
Everyone in the cooperation team, please join us thank you very much.

 

 

この投稿文は次の言語で読めます: 日本語 (Japanese)

OTHERS

茨城県北地域の天気予報

+10
°
C
H: +11°
L: 0°
大子町
月曜日, 25 1月
週間天気予報を見る
+10°+13°++++
++-3°-3°-4°
TOP