Ibaraki Prefecture North Long Trail Course Maintenance Report ⑧

August 29,2021 Maintenance was carried out

Participants led by the Ibaraki Prefecture North Long Trail Cooperation Corps maintained Chofukuzan.
In addition to the usual mowing,you can create a view,take steps,
I did various tasks by hand,such as removing the fallen trees scattered in the valley.
Chofukuzan,also known as Mt. Nantai,as opposed to Mt. Nantai.
With the maintenance,you can see Mt. Nantai from the top of the mountain.
Please look forward to the opening.

Course maintenance (August 29,2021)

This time,23 members of the cooperation team
Thank you for participating.
I was worried about the rain,
It seems that it can be maintained in the weather.
From this maintenance activity
Maintenance/utilization leader outdoor training ① has started.
This time,12 leader trainees are participating.
Divide into 2 groups and head to the maintenance site.Maintenance has started.
From the men’s shrine,walk down the valley.
Fallen trees are scattered by rain and typhoons every day,
The vegetation grows vigorously,
I can’t see the destination well.
There was also a dead red pine tree.Sasa extends from both sides of the mountain trail,
I can’t walk comfortably as it is.
It is the summit of Mt. Chofuku.
The scenery is not good because of the branches and leaves of the trees.
It was such a view at another peak.
The steep slopes are slippery.Mow the vegetation on both sides of the trail as usual.
Children also use pruning shears well,
He did his best until the end.
Where the overgrowth of vegetation is terrible
I also use a brush cutter.
After weeding,carefully collect the grass with a rake.Use a small chainsaw to secure the view
The shrubs were carefully cut down.
Wear a helmet,
Work on slopes with caution.
The felled trees are
Carry it out of the trail.
Cut the steps with a hoe and
Firmly step on with your feet.
The soil of Mt. Chofuku has a large proportion of gravel.
For cutting out and compacting steps
I had a hard time.
It is a state after maintenance.
The mountain trail in the thick valley
It was so refreshing.
Fallen trees are also cut and removed cleanly,
It’s easier to walk.
The fallen tree of Japanese red pine that was blocking the mountain trail
It’s gone clean.
There are no sasa on both sides of the mountain trail,
You can now walk comfortably.
From the top of the mountain where I couldn’t see anything
You can now see the mountains in the distance.
On the rocky vertical runway from Mt. Tsukiore to Mt. Nantai
You can see it in front of you.
Thanks to the steps on steep slopes
You can walk with confidence.
From the summit of Mt. Chofuku,you can see Mt. Nantai.
Thank you to all the members of the cooperation team.

この投稿文は次の言語で読めます:日本語(Japanese)

OTHERS

茨城県北地域の天気予報

www booked net
+10
°
C
H:+11°
L:0°
大子町
月曜日,25 1月
週間天気予報を見る
+10°+13°++++
++-3°-3°-4°

最近の記事

  1. Ibaraki Kenpoku Long Trail Event Report⑤

  2. Ibaraki Kenpoku Long Trail Course Maintenance Report ⑫

  3. May 30,2022 Published in Ibaraki Kodomo Shimbun

TOP