March 12, 2023 Signposts were installed.
Road sign installation work (March 12, 2023)
We worked with members of the Ibaraki North Long Trail Cooperation Team to set up a wayfinding trail.
This time, we walked from the parking lot near the Harutomo Sculpture Forest Athletic Park to the mountain trail, connecting to the Hitachi Alps and aiming for the summit of Mt.Takasuzu.
Thanks to the cooperation of all participants, we were able to successfully complete the installation of the target section.
Thank you very much!
Six cooperative members joined us this time. We are heading for the mountain path. | This is the location of the first run. |
We positioned and dug. The soil was hard, so we used a pickaxe. | Stones are also coming out more and more, so we shovel them out along with the soil. |
After the installation of the signposts (1) | After the installation of the signposts (2) |
After the installation of the signposts (3) | After the installation of the signposts (4) |
We had the course excavated and steps made to make it easier to walk on. | A commemorative photo at the top of Mt.Takasuzu |
この投稿文は次の言語で読めます: 日本語 (Japanese)