Ibaraki Kenpoku Long Trail Course Maintenance Report-16

January 29, 2023 – Signposts were installed.

Together with members of the Ibaraki Kenpoku Long Trail Cooperation Team, we set up road signs along the section from the Harutomo district up Kunimi Mountain to connect to Shimodaimon.

Thanks to the cooperation of many people, we were able to successfully complete the installation of the target section.

Thank you to all participants!

 

Road sign installation work (January 29, 2023)

Sixteen cooperative members participated in this year’s event. This time we will start from Harutomo to Kunimi Mountain.

First, we are giving a lecture on setting up road signs near the Harutomo parking lot. This is the first signpost of the day.

The hard soil is dug up with special tools.Whether it is horizontal or not is also important.
After installation of signposts (1)
Installed so that climbers can feel safe as they move deeper into the area.
After installation of the wayfinding signs (2)
Together with the open view.

Signposts after installation (3)
The signposts are now in a position where they can be easily seen even at a fork in the road.

After installation of the wayfinding signs (4)
After this, the decal version of the information will be installed to complete the project.

A commemorative photo at the castle ruins. Thank you, participants!

 

 

この投稿文は次の言語で読めます: 日本語 (Japanese)

OTHERS

茨城県北地域の天気予報

+10
°
C
H: +11°
L: 0°
大子町
月曜日, 25 1月
週間天気予報を見る
+10°+13°++++
++-3°-3°-4°
TOP